Commercial
Hotel Renovations
A hotel renovation is measured in rooms returned to inventory. Every day a floor is down is revenue the property does not get back.
How it is phased
Work runs floor by floor or stack by stack so the property keeps selling rooms, with separated guest and work routes and a defined turnover rate per week.
Scope
Guest rooms and bathrooms, corridors, lobbies and public areas, back-of-house, and exterior and balcony work on the same schedule.
Licensed and permitted. Work is performed under Florida Certified General Contractor licence CGC #1540717, permitted and inspected.
Questions we get asked
How many rooms a week can you turn?
Related services
Concrete Restoration
Spalling, delamination, corroded rebar and failed slab edges on occupied buildings.
Read more
Post-Tension Repair
Failed tendons, corroded anchors and slab-edge blowouts in post-tensioned structures.
Read more
Waterproofing
Traffic coatings, balcony and deck systems, sealants and below-grade.
Read moreTalk to us about Hotel Renovations
Tell us what you are dealing with. If you have an engineer's report or a county case number, mention it — it saves a step.